Dépollution de sols Annecy | France | 2024

Un acteur international de production d’emballage métallique pour l’industrie de la cosmétique a dépollué son ancien site industriel avant sa mise en vente. Dans les Alpes françaises, dans la ville d’Annecy, un projet de dépollution est réalisé avec une approche bascarbone, grâce à l’utilisation temporaire de palplanches métalliques. Dans les cas de dépollution de sols, souvent la terre est excavée et transportée vers un autre site pour y être traitée. Dans ce cas-ci, le maître d’ouvrage a choisi une variante qui évite de déplacer les sols pour leur dépollution.

Télécharger l'étude de cas complète

To ensure effective operation and to prevent any impact of the heat treatment (caused by circulation) on the ground water, the treatment area was enclosed by a curtain of watertight sheet piling.

DFC Battage installed 183 pairs of uncrimped GU 13N sheet piles, each 7 metres long. A total of 220 metres in plan was installed using a 55-tonne crawler crane with a lattice boom. To avoid vibrations that could damage neighbouring buildings, a variable high-frequency vibrodriver was used—specifically a PTC 23HFV.

 

To ensure effective operation and to prevent any impact of the heat treatment (caused by circulation) on the ground water, the treatment area was enclosed by a curtain of watertight sheet piling.

DFC Battage installed 183 pairs of uncrimped GU 13N sheet piles, each 7 metres long. A total of 220 metres in plan was installed using a 55-tonne crawler crane with a lattice boom. To avoid vibrations that could damage neighbouring buildings, a variable high-frequency vibrodriver was used—specifically a PTC 23HFV.

The top layer of soil generally consisted of brown/grey clayey fill, followed by a layer of grey clayey sand. For this particular project, the in-situ thermal desorption method was used to remove a chemical solvent (Trichloroethylene) from the soil.