Environmental Protection Solutions
Decontamination project
S 355 GP 7 m 154t
Dépollution de sols Annecy | France | 2024
Laden Sie die vollständige Fallstudie herunter
To ensure effective operation and to prevent any impact of the heat treatment (caused by circulation) on the ground water, the treatment area was enclosed by a curtain of watertight sheet piling.
DFC Battage installed 183 pairs of uncrimped GU 13N sheet piles, each 7 metres long. A total of 220 metres in plan was installed using a 55-tonne crawler crane with a lattice boom. To avoid vibrations that could damage neighbouring buildings, a variable high-frequency vibrodriver was used—specifically a PTC 23HFV.

To ensure effective operation and to prevent any impact of the heat treatment (caused by circulation) on the ground water, the treatment area was enclosed by a curtain of watertight sheet piling.
DFC Battage installed 183 pairs of uncrimped GU 13N sheet piles, each 7 metres long. A total of 220 metres in plan was installed using a 55-tonne crawler crane with a lattice boom. To avoid vibrations that could damage neighbouring buildings, a variable high-frequency vibrodriver was used—specifically a PTC 23HFV.

The top layer of soil generally consisted of brown/grey clayey fill, followed by a layer of grey clayey sand. For this particular project, the in-situ thermal desorption method was used to remove a chemical solvent (Trichloroethylene) from the soil.