Projects executed with ArcelorMittal steel sheet piles all around the globe, from permanent waterfront structures to temporary cofferdams.
Last modified: June 12, 2023

CS - FR | Removal of a level crossing in Agde, France | 2023

Agde, a level crossing is to be removed and replaced by a rail bridge over the RD 13. The removal of PN288 and the associated [...]

CS - FR | Removal of a level crossing in Agde, France | 2023

Agde, a level crossing is to be removed and replaced by a rail bridge over the RD 13. The removal of PN288 and the associated roadworks will help to improve the daily lives of local residents and transport users, both rail and road. The project consists in creating a watertight enclosure with sheet piles and a steel tubes/AZ® piles combined wall under the railway bridge, to ensure its load-bearing capacity during the temporary phase.

CS – FR | Removal of a level crossing in Agde, France | fr | 2023  (3.14 Mb)

CS - FR | A sustainable steel solution for wildlife parks in France | 2022

In France, the Bioparc of Doué-la-Fontaine near the Loire Valley and the Animal Park of Sainte-Croix in Lorraine region have chosen steel sheet piles to [...]

CS - FR | A sustainable steel solution for wildlife parks in France | 2022

In France, the Bioparc of Doué-la-Fontaine near the Loire Valley and the Animal Park of Sainte-Croix in Lorraine region have chosen steel sheet piles to create original spaces for some of their exhibits. At Doué-la-Fontaine, 250 t of GU 8S profiles form an elliptical enclosure. They were installed with a 'staggered combination' technique, alternating long lengths sheet piles interspaced with shorter sheet piles. At the 'Parc de Sainte-Croix', 310 t of PU 22-1.0 sheet piles were used.

CS – FR | Wildlife parks with steel sheet piles in France | fr | 2022  (0.21 Mb)

CS - DK | Erstatningshavn - Færgehavn Nord | Copenhagen | en | 2021

As the Nordhavn Tunnel is to be built with the cut and cover method, it requires a temporary closure of a large portion of the [...]

CS - DK | Erstatningshavn - Færgehavn Nord | Copenhagen | en | 2021

As the Nordhavn Tunnel is to be built with the cut and cover method, it requires a temporary closure of a large portion of the Svanemøllen harbour. During the construction phase harbour facilities and about half of the boat floating docks will be moved to the nearby Færgehavn Nord harbour. ArcelorMittal supplied in 2021 approximately 1190 tonnes of AU18 sheet piles, in steel grade S355GP, with a length ranging between 7.0m and 13.0m for the 450 metres long breakwater, and some 65 tonnes of 10.0m – 10.7m long GU12N, S355GP, for a new dock at Svanemøllehavnen.

CS 045 – Erstatningshavn – Færgehavn Nord – Copenhagen – DK | en | 2021  (5.22 Mb)

CS - SP | South extension of Port of Huelva, SP | 2022

The South Quay extension project at the Port of Huelva, Spain, consists of 525 m of quay with a tapered end wall. The quay is [...]

CS - SP | South extension of Port of Huelva, SP | 2022

The South Quay extension project at the Port of Huelva, Spain, consists of 525 m of quay with a tapered end wall. The quay is designed for 23.5 m maximum retention with mean tidal variation of 4 m. The sections follow a typical configuration with a front HZ®-M/AZ® combined wall, tied to a rear anchor wall.

CS – SP | Extension of the south quay at Port of Huelva, SP | 2022-en  (2.60 Mb)
CS – SP | Extensión del Muelle Sur Puerto de Huelva, España | 2022-es  (3.33 Mb)
CS – SP | Extensão do Cais Sul, Porto de Huelva, Espanha | 2022-pt  (2.60 Mb)

CS - FR | Dyke for a new polder at port of Brest, FR | 2021

860 m long dyke to extend a polder. Built from circular cells structure with AS500® straight web sheet piles.

CS - FR | Dyke for a new polder at port of Brest, FR | 2021

860 m long dyke to extend a polder. Built from circular cells structure with AS500® straight web sheet piles.

CS – FR | Dyke for a new polder at port of Brest, FR | 2021-en  (3.48 Mb)
CS – FR | Digue d’enclôture du polder du port de Brest, FR | 2021-fr  (3.48 Mb)

CS - Nordics | Urban Development in Nordic Countries | 2021

Urban development needs fast implementation and execution. This case study describes the contribution of steel sheet pile structures for the execution of temporary and permanent [...]

CS - Nordics | Urban Development in Nordic Countries | 2021

Urban development needs fast implementation and execution. This case study describes the contribution of steel sheet pile structures for the execution of temporary and permanent structures for some landmark buildings executed during the period 2010 - 2020 in Denmark, Finland, Norway and Sweden. Its watertighness and flexibility allowed the construction of (deep) cofferdams in difficult soil conditions in the sea, as well as deep pits on land.

CS – Nordic | Urban Development in Nordic Countries | 2021 – en  (18.66 Mb)

CS - DK | Port of Ronne - Bornholm | 2019

Extension of the Port of Rønne, the largest city on the island of Bornholm in Denmark. Quay 33 is a heavy-duty quay, 280 m long, and [...]

CS - DK | Port of Ronne - Bornholm | 2019

Extension of the Port of Rønne, the largest city on the island of Bornholm in Denmark. Quay 33 is a heavy-duty quay, 280 m long, and Quay 34, a multipurpose quay, is 300 m long. Dredge levels are -13.0 m. Quay 34 can accommodate cruise ships up to 350 meters. The quay walls were built with the HZ-M/AZ combined wall system (roughly 2 600 tonnes) and with an anchor level below the seawater level.

CS – DK | Port of Ronne – Bornholm | 2019 – en  (2.21 Mb)

CS - DE | Wehr Isenmühle - Heldenstein | 2020

Immediate measures on a dam at risk of collapsing with PU22 steel sheet piles

CS - DE | Wehr Isenmühle - Heldenstein | 2020

Immediate measures on a dam at risk of collapsing with PU22 steel sheet piles

CS – DE | Wehr Isenmühle, Heldenstein | 2020  (3.09 Mb)

CS - DE | Soil decontamination - Schwarze Pumpe, Spremberg | 2020

Re-use of PU22 sheet piles for polluted soil remediation in temporary enclosures.

CS - DE | Soil decontamination - Schwarze Pumpe, Spremberg | 2020

Re-use of PU22 sheet piles for polluted soil remediation in temporary enclosures.

CS – DE | Soil decontamination at “Schwarze Pumpe” site – en  (2.84 Mb)
CS – DE | Altlastensanierung Schwarze Pumpe – de  (2.83 Mb)
CS – DE | Dépollution du site Schwarze Pumpe – fr  (2.84 Mb)

CS - UK | Boston Barrier Flood Defence Scheme | 2020

Gate and flood wall protecting 14,000 properties in the city of Boston, UK – 6,260 t of steel sheet piles in high steel grades up [...]

CS - UK | Boston Barrier Flood Defence Scheme | 2020

Gate and flood wall protecting 14,000 properties in the city of Boston, UK – 6,260 t of steel sheet piles in high steel grades up to S430GP and S460AP, including some HZ®/AZ® solutions.

CS – UK | Boston Barrier Flood Defence Scheme | 2020  (1.83 Mb)

CS - BE | Railway underpass - Lokeren | 2018

Railway underpass in Lokeren, BE – 390 t of AZ®-800 steel sheet piles, using the top-down method to reduce traffic disruption to a single weekend [...]

CS - BE | Railway underpass - Lokeren | 2018

Railway underpass in Lokeren, BE – 390 t of AZ®-800 steel sheet piles, using the top-down method to reduce traffic disruption to a single weekend over the whole duration of the works.

CS – BE | Railway underpass – Lokeren | 2018  (5.25 Mb)

CS - UK | River Adur Tidal Walls - Shoreham | 2018

Flood defence scheme on River Adur to protect houses and businesses in Shoreham, UK - 4,398 t of PU28 steel sheet piles and 948 t [...]

CS - UK | River Adur Tidal Walls - Shoreham | 2018

Flood defence scheme on River Adur to protect houses and businesses in Shoreham, UK - 4,398 t of PU28 steel sheet piles and 948 t of HZ/AZ combined wall.

CS 035 | River Adur tidal walls | Shoreham | UK | 2018 – en  (1.85 Mb)
CS 035 | River Adur tidal walls | Shoreham | UK | 2018 – en  (0.27 Mb)

CS - BR | UCP Vogue - Rio de Janeiro | 2016

Underground car park (UCP) built in a new neighbourhood close to Rio de Janeiro in Brazil. ArcelorMittal supplied 355 t of GU 14N for a [...]

CS - BR | UCP Vogue - Rio de Janeiro | 2016

Underground car park (UCP) built in a new neighbourhood close to Rio de Janeiro in Brazil. ArcelorMittal supplied 355 t of GU 14N for a two levels UCP. The coated steel sheet piles are used as a permanent retaining structure.

CS 033 | UCP Vogue | Rio de Janeiro | BR | 2016 – en  (1.74 Mb)
CS 033 | UCP Vogue | Rio de Janeiro | BR | 2016 – pt  (1.73 Mb)

CS - DK | Ny Vesthavn - Port of Kalundborg | 2019

Quay wall with a double layer of tie-rods (one below water level) to reduce the required section modulus of the sheet piles (dredge level -15.0m). [...]

CS - DK | Ny Vesthavn - Port of Kalundborg | 2019

Quay wall with a double layer of tie-rods (one below water level) to reduce the required section modulus of the sheet piles (dredge level -15.0m). 2230 t of steel sheet piles delivered: AU 23, AZ17‑700, AZ19‑700. ArcelorMittal also supplied tie-rods with diameters 63.5 & 43.0mm, and accessories.

CS 032 | Ny Vesthavn | Port of Kalundborg | DK | 2019 – en  (3.12 Mb)

CS - FR | Groynes - Cayeux sur Mer | 2015

Groynes to protect the sea shore / beach from erosion. 2300 t of PU steel sheet piles were delivered in 2014 for the construction of [...]

CS - FR | Groynes - Cayeux sur Mer | 2015

Groynes to protect the sea shore / beach from erosion. 2300 t of PU steel sheet piles were delivered in 2014 for the construction of 24 groynes. It is the second phase of a project initiated in the late 1990s where some 80 groynes were built. A huge land area behind the beachfront lies below the seawater level, so the levee (beachfront) plays a crucial role for the local agriculture.

CS 027 Epis côtiers | Cayeux sur Mer | FR | 2015 – fr  (3.62 Mb)
CS 027 Buhnen | Cayeux sur Mer | FR | 2015 – de  (3.62 Mb)
CS 027 Espigones | Cayeux sur Mer | FR | 2015 – es  (3.39 Mb)

CS - DK | Unitterminal | Port of Köge

Quay wall built in the Port of Köge (Denmark) with AZ steel sheet piles in AMLoCor steel grade (more resistant to corrosion)

CS - DK | Unitterminal | Port of Köge

Quay wall built in the Port of Köge (Denmark) with AZ steel sheet piles in AMLoCor steel grade (more resistant to corrosion)

Unitterminal | Port of Köge | Denmark  (2.44 Mb)

CS - FR | Tunnel Kérino | 2018

Temporary cofferdam for the construction of a tunnel under the river Marle, in Vannes, France. It was executed in 2 phases with U-type sheet piles [...]

CS - FR | Tunnel Kérino | 2018

Temporary cofferdam for the construction of a tunnel under the river Marle, in Vannes, France. It was executed in 2 phases with U-type sheet piles and CU box piles driven down to a rock layer. Vertical micropiles were installed inside the CU box piles to increase the resistance of the toe, and additionally, battered anchors were installed at the toe. 2015 - 2016.

CS 030 Tunnel Kérino | FR | 2018  (3.35 Mb)
CS 030 Tunnel Kérino | FR | 2018 – en  (3.35 Mb)
CS 030 Tunnel Kérino | FR | 2018 – de  (3.36 Mb)

CS - DK | Highspeed railway line Copenhagen-Ringsted-TP4 | Copenhagen | 2014

Construction of a new dual track railway between Copenhagen and Ringsted via Køge. The line is designed to handle speeds of up to 250 km/h for [...]

CS - DK | Highspeed railway line Copenhagen-Ringsted-TP4 | Copenhagen | 2014

Construction of a new dual track railway between Copenhagen and Ringsted via Køge. The line is designed to handle speeds of up to 250 km/h for passenger trains and is Denmark's first railway line for high speed trains. It is around 60 km long and passes through 10 municipalities. More than 4 400 tonnes of sheet piles were installed.

CS – DK | Highspeed railway line Copenhagen-Ringsted-TP4 | Copenhagen | 2014  (2.92 Mb)

Tidal Flood Defences River Arun | Littlehampton | UK

Breakwater for "Marina Pez Vela" | CR

In 2007 a group of local investors in Costa Rica launched the project "Marina Pez Vela". The 308 slip marina features one of the most [...]

Breakwater for "Marina Pez Vela" | CR

In 2007 a group of local investors in Costa Rica launched the project "Marina Pez Vela". The 308 slip marina features one of the most sophisticated breakwaters ever built for a recreational marina, providing a safe harbour and hurricane protection.

Quepos, Costa Rica  (0.43 Mb)

CS - UK | The Rochester Riverside regeneration project - Kent

The Rochester Riverside is a flagship project within the Medway Council regeneration programme: a 32 hectare brownfield site with a 2.5 km frontage along the [...]

CS - UK | The Rochester Riverside regeneration project - Kent

The Rochester Riverside is a flagship project within the Medway Council regeneration programme: a 32 hectare brownfield site with a 2.5 km frontage along the River Medway selected for the development of a mixed use complex including up to 2,000 new homes, shops, hotels and cafes, offices, educational, health and community facilities and recreational areas. The entire frontage was to be rebuilt as part of the scheme which aimed to protect against flooding risk, renew the river frontage and remediate the contaminants resulting from the old Gas Works site.

CS – UK | Réaménagement des friches industrielles “Rochester Riverside” – Kent  (1.97 Mb)
CS – UK | Rochester Riverside regeneration project – Kent  (1.99 Mb)

CS - IT | North Quay Small Harbour & South Quay Large Harbour, Port of Piombino - Livorno

CS - IT | North Quay Small Harbour & South Quay Large Harbour, Port of Piombino - Livorno

Piombino Harbour | Italy  (2.68 Mb)

CS - FR | Basin of the drinking water pump station | Orly | 2012

Reinforcing of an existing dyke of the basin of the pumping station that supplies drinking water to Paris. This station is located close to Orly, [...]

CS - FR | Basin of the drinking water pump station | Orly | 2012

Reinforcing of an existing dyke of the basin of the pumping station that supplies drinking water to Paris. This station is located close to Orly, along the river Seine, and the north dyke erected in 1988 had to be urgently reinforced before collapse. A 390 meter long anchored steel sheet pile wall has been designed to cope with the most unfavourable loading case: flooding in the river Seine and an empty basin. The service life of the new structure is 100 years.

CS – FR | Darse de l’usine d’eau potable | Orly | 2012  (2.64 Mb)

Case Studies Rail and Motorway Construction

Containerterminal CT IIIa

The CTIIIa container terminal meets the high requirements of modern, reliable handling operations. Naturally, rail-support beams for new, super-large container gantries and water depths consistent [...]

Containerterminal CT IIIa

The CTIIIa container terminal meets the high requirements of modern, reliable handling operations. Naturally, rail-support beams for new, super-large container gantries and water depths consistent with the world's most gargantuan container ships wer both taken into consideration for this 95 million euro investment.

Containerterminal CT IIIa
Containerterminal CT IIIa Bremerhaven

CS - Angola | Porto Amboim - PAENAL

A new yard comprises a 460 m long quay wall and a 630 m breakwater for berthing of Sonangol product tankers. We supplied more than 3000 t of [...]

CS - Angola | Porto Amboim - PAENAL

A new yard comprises a 460 m long quay wall and a 630 m breakwater for berthing of Sonangol product tankers. We supplied more than 3000 t of steel heet piles, inlcuding 2600 t of AZ 50 in S 430 GP, 21.0 m long (2007 - 2010).

PAENAL base de construction  (2.41 Mb)
PAENAL fabrication yard  (2.40 Mb)

CS - AT | Redevelopment of a landfill - Horn

Pilot project in a landfill near Horn, Austria. The landfill had been filled for over 20 years with household waste and had reached saturation. This [...]

CS - AT | Redevelopment of a landfill - Horn

Pilot project in a landfill near Horn, Austria. The landfill had been filled for over 20 years with household waste and had reached saturation. This project increased the capacity by 130 000 m3. A vertical containment wall executed with steel sheet piles was chosen for its cost-efficiency and high watertightness.

CS – AT | Redevelopment of a landfill – Horn  (1.20 Mb)
Sanierung einer Deponie (Horn)
CS – AT | Réaménagement d’une décharge – Horn  (3.88 Mb)

CS - DE | Hamburg Altenwerder - Container Terminal - Phase 1

CS - DE | Hamburg Altenwerder - Container Terminal - Phase 1

Hamburg Altenwerder Container Terminal Phase 1

CS - Flood protection systems | Poland

CS - NL | High Speed Line (HSL) South | 2007

To become part of the Trans-European rail network, the Netherlands started building in 2007 an important part of railroad network, the High-Speed Line (HSL). Steel [...]

CS - NL | High Speed Line (HSL) South | 2007

To become part of the Trans-European rail network, the Netherlands started building in 2007 an important part of railroad network, the High-Speed Line (HSL). Steel sheet piles were used for permanent and for temporary structures.

CS – NL | High Speed Line South | 2007  (2.02 Mb)

CS - Schleuse Trier | DE | 2018

Die Gesamtbaumassnahme umfasst den Ausbau des oberen und unteren Vorhafens auf 225 m Länge. In Stahlspundwandbauweise werden der obere Vorhafen, die Mittelmolen im Ober- und [...]

CS - Schleuse Trier | DE | 2018

Die Gesamtbaumassnahme umfasst den Ausbau des oberen und unteren Vorhafens auf 225 m Länge. In Stahlspundwandbauweise werden der obere Vorhafen, die Mittelmolen im Ober- und Unterwasser gebaut, sowie verschiedene Temporärbauwerke inklusive eines Anfahrdalbens im Unterwasser, der als Kreiszelle aus AS® 500 Profilen erstellt wird.

CS 028 | Schleuse Trier | DE | 2018  (2.18 Mb)

CS - FR | St Laurent du Var | 2017

Flood protection scheme in Saint Laurent du Var - France (2016-2017). Rehabilitation of around 1.6 km of an existing dyke, partially with an anchored steel sheet [...]

CS - FR | St Laurent du Var | 2017

Flood protection scheme in Saint Laurent du Var - France (2016-2017). Rehabilitation of around 1.6 km of an existing dyke, partially with an anchored steel sheet pile wall using the new AZ‑800 range.

Dyke reinforcement | St Laurent du Var | France | 2017  (1.88 Mb)
Confortement de digue | St Laurent du Var | France | 2017  (1.86 Mb)

CS - Underground car parks | 2008

A few reference cases throughout the world of underground car parks built with steel sheet piles acting as a permanent retaining wall. Edition 2008.

CS - Underground car parks | 2008

A few reference cases throughout the world of underground car parks built with steel sheet piles acting as a permanent retaining wall. Edition 2008.

Underground car Parks  (6.75 Mb)
Estacionamentos subterrâneos  (11.28 Mb)

CS 021 - BE | Hopmarkt underground car park | Aalst (2014)

Three level underground car park for 317 cars in downtown Aalst, Belgium. The sheet piles were installed in a Cutter Soil Mix (CSM) wall to [...]

CS 021 - BE | Hopmarkt underground car park | Aalst (2014)

Three level underground car park for 317 cars in downtown Aalst, Belgium. The sheet piles were installed in a Cutter Soil Mix (CSM) wall to reduce the vibrations during installation.
Around 560 tonnes of AZ-700 profiles supplied in lengths of 15 m.
Built in 2012 / 2013

CS 021 – BE | Hopmarkt underground car park | Aalst (2014)  (1.78 Mb)

CS 016 - FR | Crossing area Aresquiers | Sète (2012)

Modernization of the Canal du Rhône close to Sète, in France (south). Steel sheet piles were used to build a vertical riverbank over more than [...]

CS 016 - FR | Crossing area Aresquiers | Sète (2012)

Modernization of the Canal du Rhône close to Sète, in France (south). Steel sheet piles were used to build a vertical riverbank over more than 500 metres in order to accommodate larger vessels.

CS 016 – FR | Zone de croisement des Aresquiers | Sète (2012)  (2.85 Mb)

East Quay, Port of Piombino | Livorno | Italy

East Quay, Port of Piombino | Livorno | Italy

East Quay, Port of Piombino | Livorno_It  (2.19 Mb)

CS - ZA | Maydon Wharf - Berth 12 | Durban | 2012

Rehabilitation of the Berth 12 of the Maydon Wharf - Port of Durban - South Africa (2012). Approx. 3 300 t of a combined wall HZ 1180M A-24 / [...]

CS - ZA | Maydon Wharf - Berth 12 | Durban | 2012

Rehabilitation of the Berth 12 of the Maydon Wharf - Port of Durban - South Africa (2012). Approx. 3 300 t of a combined wall HZ 1180M A-24 / AZ 18-700 (S 430 GP) in lengths of  27.3 m and 17.0 - 23.3 m. The new 270 m long combined wall was installed in front of an old sheet pile quay wall that was partially demolished. The HZ-M king piles were driven with a large impact hammer into the sandstone / siltstone layer.

CS 014 | Maydon Wharf – Berth 12 | Durban | ZA | 2012 – en  (1.82 Mb)

Flood Defences on River Thames | Deptford Creek, UK

Deptford Creek is a tributary of the Thames in London inside the Thames Barrier. In order to protect an estimated 33 000 households from flooding, [...]

Flood Defences on River Thames | Deptford Creek, UK

Deptford Creek is a tributary of the Thames in London inside the Thames Barrier. In order to protect an estimated 33 000 households from flooding, the Environment Agency identified five Wharves along Deptford Creek for immediate replacement. Existing anchored timber pile structures were assessed to be reaching a stage where failure was imminent.

Flood Defences on River Thames | Deptford Creek, UK  (2.02 Mb)

Flood Protection | Givet, France

Launched in 2006, the flood protection program of Givet in the French Ardennes enters in its final stage. The latest construction phase began in March [...]

Flood Protection | Givet, France

Launched in 2006, the flood protection program of Givet in the French Ardennes enters in its final stage. The latest construction phase began in March 2010. This 3 km long project of over 2900 m2 is the largest of its kind ever made in France.

Flood defence | Givet  (0.58 Mb)
Protection contre les inondations | Givet  (0.58 Mb)
Hochwasserschutz | Givet  (0.59 Mb)

Halbzeit an der Saale-Elster-Talbrücke | DE

Im Rahmen des Neubaus der Eisenbahnstrecke Erfurt – Leipzig/Halle entstand von 2006 bis 2012 südlich von Halle die längste Bahnbrücke Deutschlands. Sie sichert die Verkehrsströme [...]

Halbzeit an der Saale-Elster-Talbrücke | DE

Im Rahmen des Neubaus der Eisenbahnstrecke Erfurt – Leipzig/Halle entstand von 2006 bis 2012 südlich von Halle die längste Bahnbrücke Deutschlands. Sie sichert die Verkehrsströme von Nürnberg nach Berlin und von Frankfurt/M. nach Dresden.

Halbzeit an der Saale-Elster-Talbrücke  (2.82 Mb)

Manalapan Seawall, Storm protection / Erosion Control | Palm Beach, Florida, USA

In late October 2012, Hurricane Sandy roared up the US East Coast and produced a storm surge that overtopped the sea walls in South West [...]

Manalapan Seawall, Storm protection / Erosion Control | Palm Beach, Florida, USA

In late October 2012, Hurricane Sandy roared up the US East Coast and produced a storm surge that overtopped the sea walls in South West Palm Beach. Steel sheet piles were utilised to repare the damaged sea walls...

CS – US | Manalapan Seawall, storm protection and coastal erosion control at Palm Beach, Florida, USA | en | 2024  (2.99 Mb)
CS – US | Hochwasserschutz von Manalapan, Sturmschutz und Erosionskontrolle in Palm Beach, Florida, USA | de | 2024  (2.78 Mb)

Harbour Construction

This brochure gives an overview of significant waterfront projects using different types of steel sheet pile solutions. The advantages of sheet piling structures in terms [...]

HMS Alliance Restoration | Royal Naval Submarine Museum of Gosport | Hampshire | UK

HMS Alliance Restoration | Royal Naval Submarine Museum of Gosport | Hampshire | UK

HMS Alliance Restoration  (1.86 Mb)

Liefkenshoek rail link Antwerp, Belgium

The Liefkenshoek rail link, currently the biggest infrastructural project in Belgium, is forging ahead in the Port of Antwerp since its start in November 2008. [...]

Liefkenshoek rail link Antwerp, Belgium

The Liefkenshoek rail link, currently the biggest infrastructural project in Belgium, is forging ahead in the Port of Antwerp since its start in November 2008. Connecting the port installations on the left bank of the River Scheldt and the Antwerp-North main railway hub on the right bank, it will provide a solution for the growing freight traffic in this area.

Liefkenshoek rail link Antwerp, Belgium  (3.77 Mb)
Liaison ferroviaire Liefkenshoek Anvers, Belgique  (1.19 Mb)

M25 “London Orbital Motorway” | UK

Widening Section 1 Junctions 16-19 The M25 is an extremely busy motorway around the Capital. It constitutes 6% of Britain’s Motorways but carries 15% of [...]

M25 “London Orbital Motorway” | UK

Widening Section 1 Junctions 16-19 The M25 is an extremely busy motorway around the Capital. It constitutes 6% of Britain’s Motorways but carries 15% of its traffic. To alleviate the resulting congestion in the North West Quadrant where key arterial motorways, such as the M40, M1and A1(M), feed into the M25, The Highways Agency requested tenders for the widening of the Motorway in these critical areas...

CS – M25 “London Orbital Motorway” | UK  (2.17 Mb)

Multimodal platform | Port of Thionville-Illange | France

Multimodal platform | Port of Thionville-Illange | France

Plateforme multimodale | Port de Thionville-Illange_FR  (2.31 Mb)

New lock of Ivoz-Ramet | Flémale, Belgium

The Ivoz-Ramet river weir and lock complex on the River Meuse near Liège lies on the Rhine / Meuse-Main-Danube trans-European priority corridor, connecting the North [...]

New lock of Ivoz-Ramet | Flémale, Belgium

The Ivoz-Ramet river weir and lock complex on the River Meuse near Liège lies on the Rhine / Meuse-Main-Danube trans-European priority corridor, connecting the North Sea with the Black Sea. The largest tonnage in the entire Walloon Region passes through this hydraulic lock...

Nouvelle écluse d’Ivoz-Ramet, Belgique  (2.16 Mb)
New lock of Ivoz-Ramet, Belgium  (2.16 Mb)

Dubai Maritime City

The Dubai Maritime City project is located close to the Rashid port in Dubai ans consists of a 2 km2 man-made peninsula providing different areas [...]

Dubai Maritime City

The Dubai Maritime City project is located close to the Rashid port in Dubai ans consists of a 2 km2 man-made peninsula providing different areas of business, housing and marinas as well as a Ship Repair facilities wich are equiped with two ship lifts.

Dubai Maritime City, Ship Lift  (1.48 Mb)

Randweg A2 Motorway. Noise barrier, The Netherlands

ArcelorMittal started promoting steel sheet pile solutions for noise barriers a long time ago. The first noise barriers were built in France and Germany over [...]

Randweg A2 Motorway. Noise barrier, The Netherlands

ArcelorMittal started promoting steel sheet pile solutions for noise barriers a long time ago. The first noise barriers were built in France and Germany over twenty years ago, but this year we would like to highlight a quite impressive project in the Netherlands.

Randweg A2 Motorway. Noise barrier, The Netherlands  (0.87 Mb)
Ecrans antibruit, Autoroute A2 “Randweg”, Pays-Bas  (0.87 Mb)
Lärmschutzwand, Autobahn A2, Niederlande  (0.87 Mb)
Ekrany akustyczne, Obwodnica A2, Holandia  (0.89 Mb)

Rehabilitation of the "French Quay" | RE

Spool Base Jetty, Dande - Angola

'Angoflex’ spool base was inaugurated in March 2006 and is located in Dande, Angola. A Portuguese construction company was hired to build this jetty located [...]

Spool Base Jetty, Dande - Angola

'Angoflex’ spool base was inaugurated in March 2006 and is located in Dande, Angola. A Portuguese construction company was hired to build this jetty located north of Luanda, near the mouth of the Dande River, for the service of barges and ships for spooling pipelines. It features a unique 600 m long jetty, with water depths of up to 11 m at the bulkheads.

Spool Base Jetty, Dande – Angola  (2.33 Mb)

Port on the Danube: Straubing-Sand

Before the Rhine-Main-Danube canal was completed, the town of Straubing, neighbouring towns, and the region as a whole had already understood everything that stood to [...]

Port on the Danube: Straubing-Sand

Before the Rhine-Main-Danube canal was completed, the town of Straubing, neighbouring towns, and the region as a whole had already understood everything that stood to be gained from having a transfer facility on the Danube. They targeted construction of a port in Straubing-Sand in order to provide modern access to the extensive inland waterway system for commercial and industrial companies in the Gäuboden region.

Donauhafen Straubing-Sand

Skandinavienkai

Forecasts of passenger and freight traffic for 2010 and beyond soon showed that the capacity and productivity of the existing port facilities were insufficient. It [...]

Skandinavienkai

Forecasts of passenger and freight traffic for 2010 and beyond soon showed that the capacity and productivity of the existing port facilities were insufficient. It became clear that new berthing facilities had to be installed to meet the evolution of shipping and the future requirements for transfer speed.

Skandinavienkai

Munich Airport Extension

To cope with the massive growth in traffic, Flughafen München GmBH (FMG) and Deutsche Lufthansa AG decided to provide a second terminal and its full [...]

Munich Airport Extension

To cope with the massive growth in traffic, Flughafen München GmBH (FMG) and Deutsche Lufthansa AG decided to provide a second terminal and its full related infrastructure. Planning was based on a terminal capacity of 18 to 20 million passengers...

Munich Airport Extension

CS - FR | Caen & La Rochelle (2006)

Flood control scheme / Quay extension Protection anti-crue / Extension d'un quai maritime Hochwasserschutz / Ausbau eines Seehafenkais

CS - FR | Caen & La Rochelle (2006)

Flood control scheme / Quay extension
Protection anti-crue / Extension d'un quai maritime
Hochwasserschutz / Ausbau eines Seehafenkais

CS – FR | Caen & La Rochelle  (1.24 Mb)

CS - DE | Tar Waste Disposal - Rostock

Sealing of the tar waste disposal facility at the old gas works in Rostock, Germany.

CS - DE | Tar Waste Disposal - Rostock

Sealing of the tar waste disposal facility at the old gas works in Rostock, Germany.

CS – DE | Tar Waste Disposal – Rostock  (0.93 Mb)

CS - NL | Underground Car Park - Siemens - The Hague

Extension of the head office of Siemens Nederlands N.V. in The Hague. This case study describes the design and construction of a multi-storey car park [...]

CS - NL | Underground Car Park - Siemens - The Hague

Extension of the head office of Siemens Nederlands N.V. in The Hague. This case study describes the design and construction of a multi-storey car park (550 parking spaces) in which steel sheet piles were used as an intergral part of the load bearing structure. One of the walls was installed close to the railway line linking The Hague to Amsterdam.

CS – NL | Underground Car Park – Siemens – The Hague  (1.40 Mb)
Tiefgaragen Den Haag
Parking Souterrain La Haye

CS - AT | Tube Extension - Vienna

The tube extension in Vienna was one of the first projects utilizing the 750 mm wide AU sheet pile range after their launch in the [...]

CS - AT | Tube Extension - Vienna

The tube extension in Vienna was one of the first projects utilizing the 750 mm wide AU sheet pile range after their launch in the beginning of the new millenmium. Temporary trenches, installation with water jetting assistance, sheet pile sealing systems,...

Vienna tube extension  (0.68 Mb)