Water Transport Solutions
Waterways
4450 tonnes of sheet piles
Sabbioncello Canal, Quingentole, IT | 2025
Download the full case study
To address the problem of water leakage, a continuous impermeable barrier was installed along the canal using 4,450 tonnes of GU 7S steel sheet piles. The sheet pile wall reduces seepage through the embankment, limits water losses, and improves the overall hydraulic performance of the canal. In addition to enhancing water retention, the steel sheet piles help stabilize the canal banks and provide a long-lasting solution capable of withstanding varying hydraulic and environmental conditions.
The rehabilitation of the canal is expected to save approximately 6 million m³ of water annually, significantly improving irrigation efficiency and water management. The project strengthens the resilience of the agricultural water supply network while supporting more sustainable use of water resources in the region.

Section type of the project. ArcelorMittal GU7S
The rehabilitation of the canal is expected to save approximately 6 million m³ of water annually, significantly improving irrigation efficiency and water management. The project strengthens the resilience of the agricultural water supply network while supporting more sustainable use of water resources in the region.