AskBoris

AskBoris

Your request has generated 983 records «» :

Littlehampton Tidal Flood Defences, UK | 2014 | Document

The Comprehensive Project for Protecting Littlehampton Against Predicted Sea Level Rise in the UK

Copenhagen-Ringsted Highspeed Rail (TP4), DK | 2014 | Document

The Cutting-Edge project for building Denmark's first Dual-Track railway for high-speed trains in…

Unitterminal, Port of Køge, DK | 2018 | Document

The cutting-edge project for doubling the size of the port and constructing a new container terminal

Coastal groynes, Cayeux-sur-Mer, FR | 2015 | Document

Building new groynes and replenishing the pebble ridge to combat erosion and flooding in Picardy

River locks in Trier, DE | 2018 | Document

Upgrading Moselle Locks with Second Chamber

Kérino tunnel in Vannes, FR | 2013 | Document

Solving traffic sssues in Vannes with a new underpass beneath the harbour entrance

Dyke reinforcement, Saint-Laurent-du-Var, FR | 2016 | Document

Reinforcement of the dike to protect Saint-Laurent-du-Var from floods

Port of Kalundborg, DK | 2016 | Document

The development of a new container terminal with an atypical design at Kalundborg Port

Underground Car Park in Brasil | 2016 | Document

Steel Sheet Piles used as Permanent Retaining Walls for an Underground Car Park at Vogue Square, Rio de…

Shoreham Adur Flood Defence Scheme, UK | 2016 | Document

Protecting Shoreham from the risk of flooding