Download center
Here you can find all our documents by different categories
AskBoris
AI-generated content may be wrong
By chatting, you consent to the chats being recorded, used, and shared by us and our service providers according to our Privacy Policy
Your request has generated 54 records «» :
Case Study, Ports, HZ-M
The modernisation of Giurgiu port, RO | 2025
Enhancing capacity of a vital trade hub on the Danube River
Learn more
Case Study, Waterways, U-Piles
Sabbioncello Canal, Quingentole, IT | 2025
Modernising irrigation infrastructure for the Ferrara plain
Learn more
Case Study, Waterways, Z-Piles
Waterford City Flood Defences, Ireland, 2025.
Eastern and western flood defences with steel sheet piles
Learn more
Case Study, Flood, Z-Piles
Hawaiian Inn Storm Seawall in Daytona Beach | USA | 2023
A fast installation in response to natural hazards
Learn more
Case Study, Underground, Z-Piles
Watertight retaining wall in Trondheim, NO | 2025
Construction of a permanent retaining wall for the new Department of Materials Science and Engineering…
Learn more
Case Study, Flood, Z-Piles
Dyke reinforcement, Saint-Laurent-du-Var, FR | 2016
Reinforcement of the dike to protect Saint-Laurent-du-Var from floods
Learn more
Case Study, Flood, Z-Piles
Manalapan Seawall & Storm Protection, FL, USA | 2016
Storm Protection/Erosion Control Palm Beach
Learn more
Case Study, Underground, Z-Piles
Projects - Underground Car Parks
Underground Car Parks built with permanent steel sheet pile Walls
Learn more
Case Study, Flood, U-Piles
Coastal groynes, Cayeux-sur-Mer, FR | 2015
Building new groynes and replenishing the pebble ridge to combat erosion and flooding in Picardy
Learn more
Case Study, Temporary, U-Piles
New BVK headquarters in Munich, DE | 2023
Creating sustainable foundations for the BVK Munich's new headquarters at RS76
Learn more
Case Study
Urban Development in Nordic countries
Sustainable and versatile steel solutions for urban and waterfront projects
Learn more
Case Study, Mobility, Z-Piles
Removal of a level crossing, Agde, FR | 2023
Improving safety and traffic flow: Replacing level crossing PN 288 in Agde
Learn more
Case Study, Environment, U-Piles
Sustainable steel enclosures for wildlife parks, FR | 2017
Innovative steel solutions for eco-friendly wildlife habitats
Learn more
Case Study, Mobility, Z-Piles
Half-time at the Saale-Elster viaduct, DE | 2006
The Milestone in Germany's Railway Infrastructure
Learn moreCase Study, Flood, U-Piles
Isenmühle weir in Heldenstein, DE | 2020
The solution to the undermining of Isenmühle weir in Heldenstein
Learn more
Case Study, Waterways, U-Piles
Spool base jetty in Dande, AO | 2006
Innovative jetty design for Africa’s advanced spool base
Learn more
Case Study, Flood, Z-Piles
Dyke reinforcement of the drinking water plant, FR | 2012
Protecting Paris against flooding by strengthening the dock dyke
Learn moreCase Study, Ports, Z-Piles
Port of Kalundborg, DK | 2016
The development of a new container terminal with an atypical design at Kalundborg Port
Learn moreCase Study, Environment, U-Piles
Soil Decontamination at Schwarze Pumpe, DE | 2017
Creating a safe and sustainable environment
Learn more
Case Study, Flood, Z-Piles
Shoreham Adur Flood Defence Scheme, UK | 2016
Protecting Shoreham from the risk of flooding
Learn more
Case Study, Ports, Z-Piles
Unitterminal, Port of Køge, DK | 2018
The cutting-edge project for doubling the size of the port and constructing a new container terminal
Learn more
Case Study, Waterways, Z-Piles
New Lock of Ivoz-Ramet Flémalle, BE | 2011
Expanding the Ivoz-Ramet lock for Increased capacity on the Meuse waterway
Learn more
Case Study, Mobility, U-Piles
Copenhagen-Ringsted Highspeed Rail (TP4), DK | 2014
The Cutting-Edge project for building Denmark's first Dual-Track railway for high-speed trains in…
Learn more